Wednesday, November 20, 2024
Low Voltage Apprenticeship instructor Randy Rivera has added seismic bracing of the four racks to the floor beneath the tiles per code and installed fiber optic LIUs (with fiber optic housing), copper patch panels, and mock switches and servers along with monitors, and is almost finished installing the LEDs. It is thrilling to be that much closer to officially unveiling and utilizing the new data center in the Low Voltage Apprenticeship lab at our Sacramento/Rancho Cordova Training Facility!
|